Thanks again for this. So, to summarise: if my factory requires approximately 1,75MWh per annum and I introduce a solar array which provides, on average 1MWh per annum, I will only pay for 0,75MWh (which comes from the utility) and all the energy I produce from the solar array will be used before I start to receive power from the grid? Obviously, in my case I will never produce energy enough to make the meter turn backwards, but I can rest assured that all the energy produced by the array will be used BEFORE I get power from the grid?